1.5 KiB
1.5 KiB
Phase 2F Deployment Blocked — Erik Unreachable
Date: 2026-04-19 21:40 UTC
Status: BLOCKED — Network connectivity
Commit: 2ca77d0 (pushed to Gitea)
Issue
Automated deployment script failed at Erik connection step:
>> 3. Deploying on Erik (82.165.222.127)
[INFO] Connecting via SSH...
ssh: connect to host 82.165.222.127 port 22: Connection refused
Verification
- SSH: Connection refused on port 22
- Ping: 100% packet loss (host unreachable)
- Status: Erik appears offline or network-isolated
Workaround (When Erik Returns Online)
# Manual deploy steps (from PHASE_2F_DEPLOYMENT.md):
ssh root@82.165.222.127
# On Erik:
cd /opt/llm-gateway
git fetch origin
git reset --hard origin/main # Pulls commit 2ca77d0
npm install
npm run build
pm2 reload llm-gateway llm-learning --update-env
pm2 status
pm2 logs llm-gateway --lines 20
Phase 2F Deliverables (Complete)
✅ Commit pushed to Gitea: 2ca77d0
✅ Code changes ready for deployment:
- Client SDK with offline Ollama fallback
- 4 ADRs documented (0001-0004)
- Integration test suite (13/14 tests passing)
- PHASE_2F_DEPLOYMENT.md guide
⏸️ Awaiting: Erik server to come back online
Next Steps
- Restore Erik connectivity — check IONOS hosting, SSH service, network routing
- Re-run deploy script —
bash deploy/deploy.sh - Post-deployment verification — run health checks and client fallback tests
- Begin Phase 2G — Agent integration (Claude Code, Codex, Copilot, ChatGPT)